Solving neutrosophic critical path problem using Python
M. Navya PratyushaInavolu, Beside AP SecretariatVIT-AP UniversityAmaravati, Andhra Pradesh, 522237, IndiaView full profile → , *Ranjan KumarCorresponding authorranjank.nit52@gmail.comInavolu, Beside AP SecretariatVIT-AP UniversityAmaravati, Andhra Pradesh, 522237, IndiaView full profile →
* Corresponding author · click or hover a name for details
- Published Online:
- 08 Jun 2024
- Article type:
- Research Article
- Language:
- EN
- Article no.:
- JIOS-1614
- Pages:
- 897–911
Abstract
Keywords
Subject Classifications
References
[1] C. C. Wei, P. H. Liu and Y. C. Tsai, “Resource-constrained project management using enhanced theory of constraint,” International Journal of Project Management, vol. 20, pp. 561–567 (2002).
[2] H. Maylor, “Beyond the gantt chart: project management moving on,” European Management Journal, vol. 19, pp. 92–100 (2001).
[3] L. R. Foulds and J. M. Wilson, “Scheduling operations for the harvesting of renewable resources,” Journal of Food Engineering, vol. 70, pp. 281–292 (2005).
[4] J. Kelley, E. James and M. R. Walker, “Critical-path planning and scheduling,” in Papers presented at the December 1-3, 1959, eastern joint IRE-AIEE-ACM computer conference (1959).
[5] N. Paul Loomba, Management – a quantitative perspective, C. Macmillan, Ed., (1980).
[6] S. M. Fahimifard and A. A. Kehkha, “Application of project scheduling in agriculture (case study: grape garden stabilization).,” American-eurasian Journal Of Agricultural And Environmental Science, vol. 5, pp. 313–321 (2009).
[7] P. J. Bruce and M. J. Liberatore, “Project management software usage patterns and suggested research directions for future developments,” Project Management Journal, vol. 29, pp. 19–28 (1998).
[8] L. A. Zadeh, “Fuzzy sets,” Information and control, vol. 8, pp. 338–353 (1965).
[9] C. C. Chu, P. E. Zheng and D. D. Wang, “Analysis and modeling of fuzzy network planning considering complicated activity relationships,” J. Tianjin Univ, vol. 39, pp. 631–636 (2006).
[10] K. T. Atanassov and S. Stoeva, “Intuitionistic fuzzy sets,” Fuzzy Sets and Systems, vol. 20, pp. 87–96 (1986).
[11] F. Smarandache, “A unifying field in logics: neutrosophic logic.,” in Philosophy, American Research Press, pp. 1–141 (1999).
[12] H. Wang, F. Smarandache, Y. Zhang and R. Sunderraman, “Single valued neutrosophic sets,” Infinite Study, vol. 12 (2010).
[13] W. Abdelfattah, “A parametric approach to solve neutrosophic linear programming models,” Journal of Information and Optimization Sciences, vol. 42, no. 3, pp. 631-654 (2021).
[14] Jain, S., Kumar, S., Sharma, V. K., & Poonia, R. C. Peregrine preying pattern based differential evolution for robot path planning. Journal of Interdisciplinary Mathematics, 23(2), 555–562 (2020).
[15] S. Stefanov, “On the numerical solution of separable stochastic inventory control problems,” Journal of Information and Optimization Sciences, vol. 42, no. 3, pp. 533-561 (2021).
[16] A. Ebrahimnejad and J. L. Verdegay, “A new approach for solving fully intuitionistic fuzzy transportation problems,” Fuzzy Optimization and Decision Making, vol. 17, pp. 447–474 (2018).
[17] S. K. Das, T. Mandal and S. A. Edalatpanah, “A mathematical model for solving fully fuzzy linear programming problem with trapezoidal fuzzy numbers,” Applied Intelligence, vol. 46, pp. 509–519 (2017).
[18] A. B. Mohamed, C. Victor and G. Abduallah, “Evaluation of the green supply chain management practices: a novel neutrosophic approach,” Computers in Industry, vol. 108, pp. 210–220 (2019).
[19] A. Singh, A. Das, U. K. Bera and G. M. Lee, “Prediction of transportation costs using trapezoidal neutrosophic fuzzy analytic hierarchy process and artificial neural networks,” Ieee Access, vol. 9, pp. 103497–103512 (2021).
[20] A. Thamaraiselvi and R. Santhi, “A new approach for optimization of real life transportation problem in neutrosophic environment,” Mathematical Problems in Engineering, vol. 2016, pp. 1–9 (2016).
[21] I. Deli, “A novel defuzzification method of sv-trapezoidal neutrosophic numbers and multi-attribute decision making: a comparative analysis,” Soft Computing, vol. 23, pp. 12529–12545 (2019).
[22] S. Zareei, “Project scheduling for constructing biogas plant using critical path method,” Renewable and Sustainable Energy Reviews, vol. 81, pp. 756–759 (2018).




