Flowshop scheduling problem with objective of minimizing TCT

* , ,

* Corresponding author · click or hover a name for details

pp. 1–10Vol. 26Issue 1January 2023DOI: 10.47974/JIM-1641XML
Published Online:
31 Jan 2023
Article type:
Research Article
Language:
EN
Article no.:
JIM-1641
Pages:
1–10

Abstract

In manufacturing industries, scheduling problems are the origin. Particularly flowshop scheduling problem occurs in time table algorithm, operatory theory and combinatorial optimization problem with the total completion time (TCT) minimizing is a herculean task to obtain near optimal solution. Researchers are interested in solving these types of problems with the objective being that TCT is quite fashionable. Comparing the solution with existing one is quite logical to arrive the conclusion which algorithm performance better than the other. The heuristic approach developed by us, Jayakumar and Vasudevan performs better compare with other algorithms found in the literature.

Keywords

Subject Classifications

90-05

References

[1] Dannenbring D, “An evolution of flow shop scheduling heuristics”, Manage Science, 23(11), 1174-1182, (1977).
[2] Gupta J N D, “A functional heuristic for the flow shop scheduling problem”, Operational Research Quartely, 22, 39-47, (1971).
[3] Johnson S M , “Optimal two and three stage production schedules with setup times included”, Naval Research Logist Quartely, 1(1), 61-68, (1954).
[4] Jayakumar S, Meganathan R and Sathiya Shanthi R, “An Heuristic Approach for Solving two machine n-job flow shop scheduling problem with makespan objective”, IOSR Journal of Mathematics, 12(3), 23-26, (2016).
[5] Jayakumar Sundaramoorthy, Meganathan Rangaraji, Sathiya Santhi, “An Heuristic Approach for Solving permutation flow shop scheduling problem”, International Journal of Emerging Technology and advanced Engineering, 6(4) , 144-146, (2019).
[6] Jayakumar S and Vasudevan G, “Heuristic algorithm for permutation flow shop scheduling”, International Journal of Technology, 9(1), 5-7, (2019).
[7] Jayasankari S, Jayakumar S and Vijayaragavan R, “An efficient Flow shop Scheduling Problem with Makespan Objective”, Turkish Journal of Computer and Mathematics Education, 12(4), 461-466, (2021).
[8] Palmer D S, “Sequencing jobs through a multi-stage process in the minimum total time – a quick method to do obtaining a near optimum”, Operational research quartly,16(1), 101-107, (1965).
[9] Vasudevan G, Jayakumar S and Sathya Shanthi R , “A better heuristic approach for n-job m- machine flow shop scheduling problem”, Journal of Computational Mathematica, 4(1), 118-124, (2020) .
[10] Vasudevan G and Jayakumar S, “The heuristic algorithm for flow shop scheduling problem with TET objective”, Malaya Journal of Matematik, 8(4), 2071-2073, (2020).
[11] Vasudevan G and Jayakumar S, “An algorithm for solving n-job m-machine flow shop scheduling problem with objective of minimizing makespan”, International Journal of Advanced Research in Engineering and Technology (IJARET), 11(11), 1203-1207, (2020).
[12] Chang-Mingji, Hao Wu and Chuan-Gang Li, “Optimal scheduling system for reservoir electric power generation based on functional dynamic programming algorithm”, Journal of Interdisciplinary Mathematics, 21(5), 1267-1272, (2018).
[13] Xin-jun Li and Jian-jun Wang,”Parallel machines scheduling based on the impact of deteriorating maintenance”, Journal of Interdisciplinary Mathematics, 21(3), 729-741, (2018).
[14] Yahui Wang, Liuqiang Fu, Yongqiang Su, Qian Yang and Linfeng Wu, “Genetic algorithm in flexible workshop scheduling based on multi-objective optimization”, Journal of Interdisciplinary Mathematics, 21(5), 1249-1254, (2018).

Views: 126Downloads: 7Citations: 1